Files
2021-04-15 13:31:59 -05:00

23 lines
632 B
Plaintext

AST RESEARCH TECHNICAL BULLETIN TB-0050 10-24-84
DIAGNOSTIC TESTING OF THE PARALLEL PORT
In order to perform a thorough test of AST's parallel port (when
running IBM diagnostics) you need to provide the incoming signals
to the port. This may be accomplished by constructing a wrap
plug and installing it on the parallel port connector. To
construct a wrap plug use a DB25 male connector. Utilizing a
minimum of 30AWG wire make connections as listed below:
1 > 13
2 > 15
10 > 16
11 > 17
12 > 14